top of page

The Mooring Installation Plan

The final project presented to the CDWS, South Sinai Governorate and Ministry of Tourism about the permanent mooring installation around the wreck of S.S. Thistlegorm. The idea is to place concrete cement blocks of 5 tons each all around the wreck with calculated distance designed by Wind Marine Services experts. All blocks will be connected together by 2 inches steel chain. Steel wire will be attached to the chain for mooring stability calculating the up & down movements. 1- system will allow 11 boats at the same time to tie , without touching the wreck. 2- spare blocks are available for more than 11 boats 3- mooring instruction manual will be printed and distributed to dive centers and safari boats 4- blocks will numbered as for mooring , the guides will know which blocks he /she should use. 5- Names of the sponsors will be printed on flags attached to the blocks. Project steps and approximate cost at the authorities evaluation.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
bottom of page